Early Production Facility

In November 2018, FOS introduced its first EPF to PDO in Raba field with objective to maximize value of existing 6’ inch flowline. Raba field is a Lower Shuaiba waterflood development having only 3 wells drilled producing around 150 m3/d oil and around 300 m3/d of water having water cut bouncing around 50 % – 75 %. The first phase started with 3 wells and currently with 6 wells producing 1200 m3/d of oil and 1500 m3/d of water and will be increased to 2500 m3/d oil and 3000 m3/d of water.

With a strong in-house expertise in engineering, design, fabrication and packaging, we can provide a complete package ranging from 10,000 to 20,000 BBL/day that include:

  • Crude Oil Production Facilities
  • Produced Water Treatment Facilities

FOS offers a range of technologies that will cover most of EPF needs including:

  1. Two and Three Phase Separation
  2. Gas Sweetening Packages
  3. Gas Dehydration Packages
  4. Oil dehydration, desalting and heating
  5. Produced Water Treatment Packages
  6. Sand handling
  7. Flare systems
  8. Tankage and shipping

 

Latest News

CEO Mr. Tariq Al Kasbi attending December 2023 Safety Forum Organized by PDO

Our CEO Mr. Tariq Al Kasbi attending December 2023 Safety Forum Organized by PDO...

Read more

Visit of Mr. Kjetil Solbraekke, the CEO of Maha Energy

We were honored by the visit of Mr. Kjetil Solbraekke..........

Read more

FOS ENERGY SPONSORS CAMEL RACING

The third championship of Al-Bashaer camel racing...

Read more